Key takeaways
- Start with the plot: title, permitted use and the bylaws that apply.
- Plans must be prepared by registered architects and engineers.
- Budget time for approvals and NOCs before construction starts.
A commercial building in Islamabad needs approved building plans from the authority that controls the land, usually the CDA for sectors and zones, or the housing society for a private scheme. The process below is a general guide; requirements change, so confirm them with the authority before you submit.
The main steps
- Check the plot: ownership documents, permitted use and any dues.
- Confirm the bylaws: FAR, height, setbacks, parking and ground coverage.
- Design: architectural, structural and services drawings by registered professionals.
- Submit building plans with the required forms and fees.
- Obtain NOCs that apply, for example fire safety or environment.
- Approval, then construction with inspections at key stages.
- Completion: final inspection and completion or occupancy certificate.
Documents to prepare early
- Title documents and allotment or transfer letters
- Site plan and demarcation
- Soil investigation report for deep basements
- Architectural, structural and MEP drawings
- Consultant registration details